January 27 - Tuscor Lloyds has handled the transportation of 45 tonnes of condenser parts from Rivesaltes in France to Busan, South Korea.

The cargo, which consisted of three packages, was collected from Rivesaltes and loaded onto two 40 ft flatracks before being transported over 249 km by road to the port of Barcelona.

Once in Barcelona, the two flatracks were unloaded from the truck using a heavy lift crane and loaded onto a containership headed to the port of Busan.

After 30 days in transit, the vessel arrived in Korea where the condenser parts were unloaded and delivered to their final destination.

 

 

www.tuscorlloyds.com