December 24 - Throughout 2013, Tradelossa has been working on one of the biggest oil and gas projects in Latin America at the Coatzacoalcos port.

As part of the project, Tradelossa transported a 275-tonne boiler which had the dimensions 17 m x 8.5 m x 10 m.

Watch a video of this transport here (password: boiler2013).

 

 

www.tradelossa.com