June 5 - Totalplan Porto recently coordinated the shipment of pipes and turbines from Portugal to Saudi Arabia.
The entire shipment was transported using 12 40 ft flatrack containers and six 40 ft open top containers. Totalplan Porto was also responsible for all packing and lashing services.
In South Africa, Paccon Logistics has reported that the floating crane in Durban Port will be out of commission between June 17 and August 15, 2014 to undergo scheduled maintenance.
Totalplan Porto (Portugal) and Paccon Logistics (South Africa) are both members of the WCA Projects network.