November 3 - Topline Express Logistics (TEL) has coordinated the transport of two 6 m long steel plates by air from China to Korea.

TEL, which is a member of the Project Cargo Network (PCN) in China, arranged the transport of the two plates for fellow PCN member in Belgium, Europe Cargo.
 
"Because of the long length of 6 m, no carriers would accept the cargo from Beijing airport," explained Vera Xu, assistant to the TEL president. "Therefore, we managed to liaise with Europe Cargo in time and suggest that the destination airport be changed to Tianjin."
 
www.tel-group.com
 
www.europecargo.be
 
www.projectcargonetwork.com