May 4 - Goldhofer has delivered a second XLE low loader to the Stingel Group, a Germany-based company involved in heavy haulage and construction material recycling.
The XLE 8 is extendible by 3 m, has a three-axle platform bogie at the front and five-axle bogie at the back with a maximum axle load of 12 tonnes each, and is paired with a four-axle Volvo FH 16 750 prime mover. The low loader has a payload of 85 tonnes, and with the extendable drop deck the combination has a maximum length of 29 m.
According to Goldhofer, the XLE will be used to transport mobile crushers and screening plants operated by Stingel's subsidiary SBR Stingel Baustoffrecycling.