March 15 - SAL successfully completed the loading, transportation and transfer of offshore equipment for the Brazilian Peregrino Project, a Campos Basin-based oil and gas exploration and production project.
The array of cargo included a 630 tonne STP buoy, anchor chains, anchor piles and reels.
The cargo was loaded on SAL's Trina in Singapore. Due the height of the 18 metre buoy, the vessel sailed to Rio de Janeiro with an open hatch.
As well as acting as the transportation unit, Trina served as a storage unit for the supply vessel serving the oil field.