September 2 - OliCargo has coordinated the transport of a reactor for a hydrogen peroxide production factory from Portugal to Argentina.
The company's project cargo manager, João Ribeiro, explained that the unit, which measured 31.5 m long with a diameter of 4.8 m and weighed 194 tonnes, was loaded at the port of Leixões and shipped to the Argentinian port of Bahia Blanca onboard a heavy lift vessel.
OliCargo is a member of the Project Cargo Network (PCN) in Portugal.