h
The project involved transporting the 18,500 cu m of cargo from the manufacturer's site in Oliviera de Frades, Portugal to the Port of Aveiro, before the structures were shipped to the Port of Manaus in Brazil and delivered to the stadium by road.
The entire shipment required the use of four 120 m long vessels and over 550 trucks.
Olicargo is a member of the Project Cargo Network (PCN) representing Portugal.
Watch a video of this project here: