May 18 - FLS Projects has handled the loading operations for eight modules and two drums destined for the EMAL Aluminium Smelter project in Abu Dhabi, UAE.
FLS loaded the modules, which had a total weight of 1,200 tonnes, at the Port of Luojing in China before the chartered vessel was loaded with two drums, with a total weight of 140 tonnes, at the Port of Gunsan in South Korea.
The cargoes will be delivered to Port Khalifa in the UAE.
This is the fourth shipment FLS has handled for the EMAL Aluminium Smelter project