December 22 - Twenty high-voltage wire drums, manufactured by General Cable, have been transported down the Seine between the Haropa ports of Montereau-Fault-Yonne and Le Havre.
French industrial logistics provider AltéAd contracted multimodal operator Logiyonne, which operates a weekly river service from the port of Gron in Burgundy to Le Havre, to transport the 600-tonne consignment downriver.
On arrival at Le Havre, the cargo was shipped to Mexico for oncarriage to its final destination in Irapuato.