November 28 - Collett Transport has transported a 100-tonne boiler from Rotterdam to Selby in the UK, on behalf of German transport company Max Goll.
Collett's project team handled the unloading of the cargo from a barge in Rotterdam, before transporting the boiler to its final destination in the UK.
As well as transport, Collett also provided lifting services on site, utilising a 500-tonne capacity crane, mobile elevated work platforms, a rigger and a banksman to help install the boiler.
The installation is expected to take two weeks to complete. Collett has also arranged to supply a 200-tonne capacity and 30-tonne capacity mobile crane for the duration of the project.