October 29 - The aerospace teams of SDV, a brand of the French service provider Bollor
The equipment was 27 m long, 8 m in diameter, and had an indivisible weight of 330 tonnes.
As part of this large-scale operation, SDV chartered a vessel to transport the cargo from South Korea to Germany.
On arrival at a German port, the shipment was offloaded and transferred onto a special low bed trailer.
SDV teams then delivered the load to Premium Aerotec, one of the leading suppliers for structures and manufacturing systems for aircraft construction, based in Nordenham (Germany).