In cooperation with Tanzania Port Authority (TPA), CJ ICM and BEME VOF, Alistair Group has offloaded 16,000 cu m of oversized cargo at Mtwara port.
The cargoes arrived at the Tanzanian port onboard a Spliethoff vessel at the end of February. The shipment was offloaded in five days and will eventually be barged to a project site in Afungi, Mozambique.