Daewoo Shipbuilding and Marine Engineering (DSME) has contracted Huisman for the delivery of a 2,600-tonne capacity leg encircling crane (LEC).
The crane will be installed on a wind turbine installation vessel ordered by Eneti. It will be outfitted with a 155 m boom, which will reach a lifting height of 174 m above deck.
The crane design is lightweight, has high positioning accuracy and energy efficient, contributing to a reduced emissions footprint during operations.