Çaba & Misnak’s project logistics, heavy lifting and engineering division has repositioned a 2,500-tonne vessel at a Turkish shipyard.
The transport operation was completed using SPMTs supplied by Germany-based manufacturer Scheuerle. Power pack units were used to drive the ship onto a floating dock.