February 2 - Spanish freight forwarder, Altius Projects Division has handled the shipment of an oil rig jacket, plus additional equipment, from Aviles (Spain) to Grenaa.
As the picture shows, the jacket, which measured 30 m x 27 m x 15 m and weighed 576 tonnes (pictured below), was loaded onboard SAL Shipping's Trina.