Scaldis has lifted the Hewett gas field’s 52/5A jacket, which was installed in the 1960s, from the seabed using lift vessel HLV Gulliver and delivered it to the decommissioning yard in Flushing, Netherlands.
The move follows the successful removal of the Hewett gas field’s 52/5A topside earlier this summer.
In 2022, HLV Gulliver and Rambiz placed a 5,000-tonne intake head on the seabed of the Bristol Channel for the EDF’s Hinkley Point C project in the UK.