Volga Dnepr partnered with Kuehne + Nagel for the delivery of a turbine from the East Midlands in the UK to Russia.

The 4.5-ton (4.1 tonne) shipment was loaded onto Volga Dnepr’s IL-76TD-90VD aircraft using the freighter’s onboard crane system.

www.volga-dnepr.com