Steder Group has coordinated the transhipment of crane components at RHB’s terminal in the port of Rotterdam, the Netherlands.

Four crane parts arrived at the port from Drachten on an inland waterway vessel and needed to be transhipped onto a coaster vessel for onward delivery to Norway.

To load the cargoes, Steder Group utilised RHB’s 208-tonne capacity LHM 600 mobile heavy lift crane.

The crane parts were then transported to the port of Leirvik, Norway.

Steder Group is a member of the Worldwide Project Consortium (WWPC) in the Netherlands.

www.stedergroup.com

www.wwpc.eu.com

www.rhb.nl