Sarens is currently involved in the largest project it has ever undertaken: the load-in and load-out of pre-assembled units (PAUs) at the Tengizchevroil (TCO) Southern Trans-Shipment Base (STSB) in Bulgaria.

Sarens’ role in this project began in July 2018; the company is responsible for the load-out, storing, stacking, and transport of the prefabricated modules at the transhipment base. The PAUs are delivered on oceangoing vessels, in preparation for shipment to the Caspian on smaller inland waterway craft.

SPMTs are being used to complete PAU loading operations, due to their low height and configurability, according to Sarens.

www.sarens.com