SaCeMa Nordic Projects has moved mining equipment to northern Sweden.
The consignment included a 43-tonne unit that measured 5.57 m x 4.68 m x 4.14 m, plus a 10-tonne accessory.
The move was completed on behalf of Spain’s Logistica Suardiaz.
Both SaCeMa Nordic Projects and Logistica Suardiaz are members of the XLProjects (XLP) network.