SaCeMa Nordic Projects has moved mining equipment to northern Sweden.

The consignment included a 43-tonne unit that measured 5.57 m x 4.68 m x 4.14 m, plus a 10-tonne accessory.

The move was completed on behalf of Spain’s Logistica Suardiaz

Both SaCeMa Nordic Projects and Logistica Suardiaz are members of the XLProjects (XLP) network. 

www.sacemanordic.com

www.suardiaz.com 

xlprojects.net