OXBO Mega Transport Solutions coordinated delivery of a 186 ft (57 m) demethaniser tower from the Watco Terminal in Houston, Texas, to Loving, New Mexico.

OXBO covered more than 1,000 miles (1,609 km) of winding routes during the eye-catching project. It reached the destination in just six days, with offloading taking place on day seven.

The haul was performed using a combination of OXBO’s four-axle prime movers pulling the load and a three- axle prime mover pushing it. The tower was securely positioned on 16 lines of Goldhofer trailers equipped with self-tracking turntables.

In January 2025, HLPFI reported that OXBO used Goldhofer THP-SL bolstered trailers to transport equipment in Texas.