Logistics Plus has assisted with the construction of a floating storage and regasification unit (FSRU) in China.
Three regasification modules were transported from the production facility to the shipyard in China. The largest module measured 20 m x 10.5 m x 14.5 m and weighed 425 tonnes.
Logistics Plus noted that its global project manager Frederik Geirnaert, who is based in Belgium, would usually attend the operations in China. However, as a result of the Covid-19 outbreak, he had to oversee the operations via a direct video link, provided by the nominated marine warranty surveyor.
You can watch the highlights of this project here.