Allseas’ Pioneering Spirit has installed the Beta transformer station topside for the Hollandse Kust Zuid (HKZ) offshore wind farm.

Screenshot 2022-04-01 at 10.27.08

HLPFI readers will recall the topside departed Drydocks World Dubai’s fabrication yard during March onboard Boskalis’ heavy transport vessel Mighty Servant 3.

The topside was loaded onboard Pioneering Spirit in Rotterdam and was subsequently installed within three days.

allseas.com