FTE Logistics has transported and installed nine bullet tanks for an LPG expansion project Riyadh, Saudi Arabia.

The tanks weighed 950 tonnes and measured 8.7 m x 11. 7 m. FTE Logistics deployed Scheuerle SPMTs to transport the tanks on behalf construction company Zamil Industrial. The equipment was moved from the company’s fabrication facility in Dammam to the project site in Riyadh.

www.fte-heavylift.com

www.scheuerle.com