ALE has recently completed the installation of a roof for the Olympic Parque Roca swimming pool in Buenos Aires, Argentina.
ALE used a 600-tonne crawler crane with a luffing jib and 30.5 m mast to install six sections, each weighing up to 50-tonnes. ALE also handled the installation of a springboard and steel structure.
The Parque Roca stadium will host the Youth Olympic Games in October 2018.