Project logistics specialist Blue Water Shipping will transport 15 topside modules for Yinson Production’s Agogo floating, storage, production and offloading vessel (FPSO).

Picture1

Source: Blue Water Shipping

Blue Water’s floating productions systems (FPS) project team will oversee the work, with the heaviest module tipping the scales at 3,211 tonnes. The first transportation is scheduled for May 2024 and will involve handling both domestic carriage within China and international transport from Indonesia and Vietnam to China. 

The Agogo FPSO will be operated by Yinson Production in the West Hub field of Block 15/06 offshore Angola for Azule Energy